On November 29th, 2019, at the Becamex industrial park, Binh Phuoc province, WorldSteel Group cooperated with GPPD Energy Co., Ltd. to hold a groundbreaking ceremony for a battery factory construction project. Attending the ceremony were the representative of Investor’s representative – Mr. Vuong – Chairman of GPPD Group, Ms. Huang Xiao Yun – Chairman of the Board of Directors of GPPD Energy Co., Ltd., representative of General Contractor Mr. Nguyen Khanh Lam – Chairman of WorldSteel Group, leaders of Binh Phuoc province and Supervision Consultants.
PROJECT OVERVIEW
- Project: GPPD solar cell manufacturing factory.
- Area: 30,000m2.
- Location: B1-A lot, Becamex Industrial zone, Minh Thanh village, Chon Thanh District, Binh Phuoc Province.
- Investor: GPPD Energy Co., Ltd.
- General Contractor: WorldSteel Group.
GPPD Energy Co., Ltd. Factory project is invested by GPPD Energy Ltd., a company with 100% Singapore investment. The GPPD is the first factory in Vietnam applies the green technology to manufacture mercury – free alkaline batteries and all accessories do not contain mercury. In particular, this project is the factory GPPD Group’s third-largest factory in the world.
GPPD Energy Co., Ltd. Factory project is well located in the Becamex Industrial Park in Binh Phuoc Province. It has diverse ownership structures, complete infrastructure, convenient transportation and especially the skilled workforce. The project has a total area of 30,000m2 with an investment of up to 15 million USD. It is expected that when completed will reach the total capacity of 936 million products/year, in which phase 1 is 336 million products/year and phase 2 is 600 million products/year. The main product is mercury-free alkaline batteries and all accessories do not contain mercury.
At the ground-breaking ceremony, Representing the investor of GPPD Energy Co., Ltd. – Ms. Huang Xiao Yun shared and expressed absolute trust to the reputation and capabilities of WorldSteel Group – Representing the General Contractor will deploy construct professionally and hand over the project on time, this is the key factor that the factory can come into the operation soon.
In response to that trust, the leadership has released detailed guidelines for the project implementation to follow the best way to professionalize and synchronize right after the ceremony. With years of experience and human resources, modern equipment, safety standards while highly determined and responsible, WorldSteel commit to complete the project on schedule and achieve the best quality.
SOME HIGHLIGHT PHOTO IN THE CEREMONY