WORLDSTEEL IS THE FIRST COMPANY IN ASIA ACHIEVING IAS AC472 CERTIFICATION!

IAS Accreditation for Metal Building Systems Inspection (AC472)

  • Verification that approved manufacturers meet requirements as described in Chapter 17 of the IBC.
  • The benchmark for companies that design and manufacture engineered metal building systems.
  • Provides a level of confidence that buildings will be designed and manufactured according to code and specifications.
  • Recognized by the Metal Building Manufacturers Association (MBMA) and International Code Council (ICC).

BENEFITS TO THE BUILDING OWNER

Owners purchasing building products from non-IAS AC472-accredited metal building manufacturers may be taking a risk, buying products which may not necessarily meet their long-term best interest. Building owners have found that purchasing a building from an accredited manufacturer has provided the following:

  • Compliance with special inspection requirements in Chapter 17 of the International Building Code®.
  • Expedited acceptance of plans by code officials.
  • Better protection for occupants and contents.
  • Lower insurance rates.
  • Lower maintenance costs.
  • Lower utility costs.
  • Better resale value.

See more: AC472 Faqs

VIDEO: WHY AC472 ACCREDITATION MATTERS BY MBMA

WHAT IS PRE-ENGINEERED STEEL BUILDING ?

Pre-Engineered Steel Building is structural steel building built over three members connected to each other:

  • The primary members: columns, rafters, bracing,…
  • The secondary members: Z or C purlins, girts, eave struts,…
  • Roof and wall sheeting: roof and wall panels, interior roof and wall liners, soffit panels… A complete solution for PB project includes

PRE-ENGINEERED STEEL BUILDING DESIGN STANDARDS

All projects are designed and manufactured following the latest US standards:

  • AISC 360 -10: 2010 Specification for Structural Steel Buildings
  • AWS Dl.1/Dl .1M: 2015 (2nd Printing) Structural Welding Code-Steel
  • MBMA 2012: 2012 Metal Building Systems Manual
  • IBC 2015: 2015 International Building Code

We can apply other international design standards based on your requirements.

PRE-ENGINEERED STEEL BUILDING APPLICATION

  • High-rise building
  • Factory
  • Warehouse
  • Shopping mall
  • Showroom
  • Equipment support and Pipe rack
  • Airport terminal, Station, Stadium

WHY CHOOSE PRE-ENGINEERED STEEL BUILDINGS?

01

Overall price

Overall price

Price per square meter can be 25% lower than conventional steel building

02

Structure weight building

STRUCTURE WEIGHT BUILDING

+ About 30% lighter through the-efficient use of steel. Primary framing members are tapered varying depth built-up plate sections with large depths in the areas of highest stress.

+ Secondary members are light gage (light weight) cold formed (low labor cost) “Z” – or “C” shaped members. Z purlins / girts can be lapped.

+ Lapping reduces the deflection, and allows double thickness at the points of higher stresses (support points)

03

Quality Control

Quality Control

Designed and fabricated in-house with strict quality control. The fabrication process is controlled from start to finish, including design and engineering, as well as detailing and manufacturing at factory

04

DELIVERY TIME

DELIVERY TIME

+ PB can be delivered within 6-8 weeks.

+ About 30-50% times saving in total project schedule due to fast delivery and quick site erection

05

Erection cost & time

+ Site erection cost is low because of faster erection times and easier erection process.

+ Erection costs & time are accurately known, based upon extensive experience with similar buildings.

06

Architecture

+ PB can be applied for complex structures and highly aesthetic projects.

+ Based on its compact structure, PB is suitable for various forms of long span and highly aesthetic structure characterized by simple and effective steel structures.

+ These buildings use standardized materials that have been proven to meet a variety of structural and aesthetic require-ments and the components are engineered beforehand.

07

Erection Simplicity

+ The column and rafter components of PB are I beams which are linked by bolts and braced by simple bracing systems. So the erection process is fast, step by step, easy to install and require minimum heavy equipment.

+ In particular, as the PB column itself is highly stable, we don’t need to use complex as many bracing system as CB.

08

Design Process

Design Process

+ ‘Since PB’s are mainly formed of standard sections and connections, the design time is significantly reduced.

+ Specialized computer analysis and design programs optimize material requirements.

+ Drafting is computerized that minimizes project custom details.

09

Foundation

Foundation

+ Simple design easy to construct and light weight.

+ Suitable for soft foundation as paddy land, sandy soil.

10

Earthquake Resistance

Earthquake Resistance

Low weight flexible frames of PB offer higher resistance to earthquake loads.

11

Future Expansions

Future Expansions

PB can be easily expanded in length by adding additional bays. Also expansion in width and height is possible by prede¬signing for future expansion.

12

Simple Source Responsibility

Simple Source Responsibility

Single source of supply results in total responsibility for one supplier, including design liability.

WORLDSTEEL PROJECTS

Close

7-Eleven Project

  • Project: 7-Eleven store chain
  • Investor: Thailand 7-Eleven
  • Quantity: 791 tons
  • Field: Commerce
  • Nation: Thailand
Close

An Phu 3S Hyundai project

  • Project name: Hyundai An Phu 3S
  • Location: Mai Chi Tho St.- District 2 - Ho Chi Minh City
  • Type of business: Trading
  • Scope of work: Manufacturing and erecting steel structures
  • Weight: 400 tons
Close

Anh Phat factory project

  • Project name: Anh Phat Factory
  • Location: Hai Son Industrial zone – Long An Province
  • Type of business: Industry
  • Scope of work: Manufacturing and erecting steel structures
Close

Bao Loc Showroom Project

  • Investor: SANDALS JOINT STOCK COMPANY
  • Main contractor: WorldSteel Group
  • Category: Steel structure manufacture, covers
Close

Ben Tre Exhibition House Project

  • Project name: Ben Tre Exhibition House
  • Field: Exhibition House
  • Categories: Design, manufacture and erection
  • Location: Huu Dinh Commune, Chau Thanh District, Ben Tre Province
Close

Binh Chau Hot Spring Renovation Project

  • Project: Binh Chau hot spring renovation
  • Address: Binh Chau, Xuyen Moc, Ba Ria - Vung Tau
  • Field: Tourism
  • Scope of work: Manufacture and Erection of steel structures